Weston Homes Plc
| Case Study |
| Client: Weston Homes Plc |
Project: Weston Homes Plc turn to Rapid for total heating and cooling solution |
ddddddddddddddddddddddddddddddddddddddddddddddd
A prestigious new office complex belonging to one of the
dddddddddddddddddddddddddddddddddddddddddddddd
dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
The decision was taken at the design stage to incorporate one system which could handle both cooling and heating for the entire building and Weston Homes looked at a variety of suppliers before choosing Rapid Air Conditioning based on their experience and reputation for large scale commercial installations.
dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
The system specified by Rapid for this project was a ducted heating and cooling system with a highly efficient heat recovery fresh air supply and extraction system. It also had to incorporate a specialist close control system to maintain optimal temperatures within the large IT suite.
dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
The three-month programme also involved the installation of a fresh air supply and extraction system within the commercial kitchen and localised extraction for all toilet facilities. A specialist BMS system ensures ease of operation and fault diagnosis with remote access.
dddddddddddddddddddddddddddddddddddddddddddddddddddddd
Barry Cheek, Construction Director at Weston Homes, commented: “Our new building contains a lot of glass meaning that there is the potential in summer for temperatures to become uncomfortably hot. This, along with the economies of scale of a single installation, was key to our decision to go for a combined heating and cooling system”.
dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
What they say:
“We were delighted with Rapid’s innovative approach to the challenge we had set and with the final solution, which has combined functionality with efficiency and reliability at a highly competitive cost”.
Barry Cheek
Construction Director
Weston Homes