IOR Group
| Case Study |
| Client: IOR Group |
Project: Supply and installation of air conditioning to IOR Group offices in Richmond |
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
IOR Group are a company who specialise in creating aspirational workplaces. With a headquarters in
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
There was an existing system in the general office area so Rapid focused on their server room at 6x4 feet it is taken up mostly by a large server cabinet which is responsible for all their customer data.
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
A vital area to the business, it was important that the equipment was properly cooled to prevent any breakdowns. Rapid designed a wall-mounted split system that fits neatly in the corner of the space, providing effective cooling to their servers.
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
IOR have five floors housing their workforce and have areas including a gym, rooftop communal area, general office space and server room. Rapid have now got the maintenance contract for all equipment on site.
What they say:
"Rapid are efficient, can be relied upon for a quick turnaround on quotes and specs. I would condider them on our prederred suppliers, chosen based on price and service level in most cases."
John Morris
IOR Group




