Client: Holiday Inn, Newport
Project: Installation of Unico 'Easi-Fit' air conditioning and heating in luxury bedrooms and conference suits

Holiday inn

dddddddddddddddddddddddddddddddddddddddddddddddddddd

Download full PDF

When guests stay at the Holiday Inn Newport they can expect a warm (or a cool) welcome, because they will benefit from fully climate controlled rooms with the award winning Unico ‘Easi-Fit’ air conditioners, which have been installed to ensure visitors are comfortable throughout their stay – day and night.

ddddddddddddddddddddddddddddddddddddddddddddddd

The Unico 11 HP is a self-contained unit with no external condenser or pipe work, which provides both cooling and heating, and operates from a standard 13 amp power supply. They can be installed at either high or low level to suit the room décor and space available, and the stylish design makes the Unico the perfect choice for hotel bedrooms.

ddddddddddddddddddddddddddddddddddddddddddddddddddddddd

Holiday inn 3The decision to appoint Rapid was taken because they could supply and install the Unico cost-effectively and planned installation around the needs of the hotel. While a traditional installed system was an option, hotel General Manager, Mr Paul Ferguson favoured the Unico due to the speed and convenience of installation and the fact that they are an economical and versatile ‘all-in-one’ Climate Control Solution.

ddddddddddddddddddddddddddddddddddddddddddddddddd

The units are installed independently in each room without the need to refurbish, so there was no detrimental effect on room occupancy and minimal disruption to guests and staff at the hotel. Paul Ferguson is delighted with the feedback he has received from guests.

ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd

What they say:

Holiday inn 2We appointed Rapid to supply and install Unico 11 HP air conditioners in 64 bedrooms and a further 6 in our syndicate conference rooms, to provide complete climate control in these areas.

ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd

From our perspective, it was ideal that we could have air conditioning installed independently in each room with minimal disruption in the hotel, and we’ve been delighted with the great comments from our guests. Climate Control has become essential in the hospitality sector and we’re very pleased with the results we’ve had working with Rapid.

Paul Ferguson

General Manager

Holiday Inn, Newport