[Skip to main content]

Docklands Dental Centre

Case Study
Client: Seema Sharma & Associates

Project: Relocation of dental practice and installation of new air conditioning systems in existing offices

Docklands Dental

dddddddddddddddddddddddddddddddddddddddddddddddddddddddd

Download full PDF

Health centres and dental practices have an extra incentive when contemplating the installation of air conditioning. Comfort cooling is not the only consideration, as reduction in patient stress levels contributes to both easier and quicker completion of each consultation.

dddddddddddddddddddddddddddddddddddddddddddddddddddddd

Rapid Air Conditioning has provided a complete solution for the Docklands Dental and Complementary Health Centre in London. Careful consideration was given to the ambient requirements in all areas of the practice, from reception and waiting areas to surgeries, children’s clinic and preventative dental unit.

ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd

Using a building company which specialises in work for the dental sector, Rapid Air Conditioning surveyed the whole area both for temperature control demands and how to keep visible evidence of air conditioning equipment to a minimum.

dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd

Docklands Dental 2Split Units were used, either Wall or Ceiling Mounted Units as appropriate to the particular area, and all the pipework was concealed within partitions and false ceilings. A total of fifteen different areas were fitted with air conditioning units including some which were relocated from previous premises. Due to limited external space, special consideration was also given to the location and number of external condenser units. The final system design allowed all fifteen internal areas to be serviced by just 10 external units.

dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd

The air conditioning work on this relocation accounted for only 10% of the overall costs but the benefits to both the practice and patients are substantially more.

ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd

What they say:

“We have been very happy with the installation provided by Rapid. We are now able to provide a comfortable environment for both patients and staff throughout the centre”

Spokesperson

Seema Sharma & Associates

Back to case studies