Brady Corporation
| Case Study |
| Client: Brady Corporation |
Project: Supply and installation of integrated air conditioning in new headquarters building |
dddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Rapid have provided a total solution ensuring optimal ambient temperatures at the newly refurbished
dddddddddddddddddddddddddddddddddddddddddddddddddddddddd
The 25,000 sq ft facility at Banbury in Oxfordshire is home to several hundred office staff as well as warehouses, a canteen, conference facilities and a communications room, all with their own individual requirements from the new system.
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Rapid’s task involved the breakdown and removal of an existing chilled water based system, and the design and installation of a complete new system using ozone friendly refrigerant.
ddddddddddddddddddddddddddddddddddddddddddd
The main open plan office area which houses the buying, marketing and IT sections is now served by high-grade Mitsubishi Electric Ceiling Cassette Units that are unobtrusive but quiet and highly efficient. These units have also been used to service the large meeting rooms, canteen and post room, whilst the reception area features a ceiling concealed ducted unit that is unnoticeable to visitors. The facility’s smaller offices and meeting rooms have had high-level Wall Mounted Units installed.
dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Rapid’s turnkey solution extends to a Lossnay Heat Recovery Ventilation System for enclosed spaces, which reduces both wasted energy and operating costs and the fitment of a new ventilation system for the staff toilets.
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
A spokesperson for Brady Corporation




